Yi-Chi Wang's Publications

Referred Journal Articles

  1. Chen, T. and Wang, Y.-C., (2011), "A Fuzzy-Neural Approach for Global CO2 Concentration Forecasting," Intelligent Data Analysis, 15(5), 763-777. (SCI)

  2. Wang, Y.-C., Chiu, Y.-C., and Hung, Y.-P, (2011), "Optimization of Multi-task Turning Operations under Minimum Tool Waste Consideration," Robotics and Computer-Integrated Manufacturing, 27(4), 674-680. (SCI, EI)

  3. Chen, T. and Wang, Y.-C., (2011), "A Hybrid Fuzzy and Neural Approach for Forecasting the Book-to Bill Ratio in the Semiconductor Manufacturing Industry," International Journal of Advanced Manufacturing Technology, 54(1-4), 377-389 (SCI, EI)

  4. Chen, T., Wang, Y.-C., and Lin, Y.-C., (2010), "A Fuzzy-Neural System for Scheduling a Wafer Fabrication Factory," International Journal of Innovative Computing, Information and Control, 6(2), 687-700. (SCI, EI)

  5. Jeang, A., Li, H.-C., and Wang, Y.-C., (2010), "A Computational Simulation Approach for Optimising Process Parameters in Cutting Operations," International Journal of Computer Integrated Manufacturing, 23(4), 325-340. (SCI, EI)

  6. Chen, T. and Wang, Y.-C., (2010), "A Bi-Criteria Nonlinear Fluctuation Smoothing Rule Incorporating the SOM-FBPN Remaining Cycle Time Estimator for Scheduling a Wafer Fab - A Simulation Study," International Journal of Advanced Manufacturing Technology, 49(5-8), 709-721. (SCI, EI)

  7. Chen, T. and Wang, Y.-C., (2010), "Incorporating the FCM-BPN Approach with Nonlinear Programming for Internal Due Date Assignment in a Wafer Fabrication Plant," Robotics and Computer-Integrated Manufacturing, 26(1), 83-91. (SCI, EI)

  8. Chen, T. and Wang, Y.-C., (2010), "An Evolving Hybrid Neural Approach for Predicting Job Completion Time in a Semiconductor Fabrication Plant," European Journal of Industrial Engineering, 4(3), 336-353. (SCI, EI)

  9. Chen, T. and Wang, Y.-C., (2009), "A Non-linear Scheduling Rule Incorporating Fuzzy-Neural Remaining Cycle Time Estimator for Scheduling a Semiconductor Manufacturing Factory," International Journal of Advanced  Manufacturing Technology, 45(1-2), 110-121. (SCI, EI)

  10. Chou, C.-H., Wang, Y.-C., Tsai, H.-J, Lin, K.-J., Lai, J.-M., and Chen, T.-H., (2009), "Evaluating and Modeling the Flow Line and Operations of a Real Swine Abattoir in Central Taiwan: a Simulation Study," Taiwan Veterinary Journal, 35(3), 209-216. (in Chinese)

  11. Chen, T., Wu, H.-C., and Wang, Y.-C., (2009), "Fuzzy-neural Approaches with Example Post-Classification for Estimating Job Cycle Time in a Wafer Fab," Applied Soft Computing, 9(4), 1225-1231. (SCI, EI

  12. Chen, T., Wang, Y.-C., and Tsai, H.-R., (2009), "Lot Cycle Time Prediction in a Ramping-up Semiconductor Manufacturing Factory with a SOM-FBPN-ensemble Approach with Multiple Buckets and Partial Normalization," International Journal of Advanced Manufacturing Technology, 42(11-12), 1206-1216. (SCI, EI)

  13. Chen, T., Wang, Y.-C., and Wu, H.-C., (2009), "A Fuzzy-Neural Approach for Remaining Cycle Time Estimation in a Semiconductor Manufacturing Factory - A Simulation Study," International Journal of Innovative Computing, Information and Control, 5(8), 2125-2139. (SCI, EI)

  14. Chen, T. and Wang, Y.-C., (2009), "A Fuzzy Set Approach for Evaluating and Enhancing the Mid-term Competitiveness of a Semiconductor Factory," Fuzzy Sets and Systems., 160(5), 569-585. (SCI, EI)
  15. Wang, Y.-C. and Chen, T., (2008), "Modeling and Optimization of Machining Conditions for the Multi-pass Dry Turning Process," Proceedings of Institution of Mechanical Engineers, Part B, Journal of Engineering Manufacture, 222(11), 1381-1394. (SCI, EI)
  16. Wang, Y.-C., (2008), "Evaluating Flexibility on Order Quantity and Delivery Lead Time for a Supply Chain System," International Journal of Systems Science, 39(12), 1193-1202. (SCI, EI)
  17. Wang, Y.-C., Chen, T., and Li, K.-T., (2008), "Enhancing the Mid-term Competitiveness of a Semiconductor Manufacturing Factory through Collaborative Yield Learning Planning, Materials Science Forum, 594, 475-480. (EI)
  18. Chen, T., Wang, Y.-C., Lin, Y.-C., and Yang, K.-S., (2008), "Estimating Job Cycle Time in Semiconductor Manufacturing with an ANN Approach Equally Dividing and Post-classifying Jobs," Materials Science Forum, 594, 469-474. (EI)
  19. Wang, Y.-C. and Cheng, W.-T., (2008), "A Sensitivity Analysis of Solving Joint Replenishment Problems using the RAND Method under Inaccurate Holding Cost Estimates and Demand Forecasts," Computers & Industrial Engineering, 55(1), 243-252. (SCI, EI)
  20. Chen, T., Jeang, A., and Wang, Y.-C., (2008), "A Hybrid Neural Network and Selective Allowance Approach for Internal Due Date Assignment in a Wafer Fabrication Plant," International Journal of Advanced Manufacturing Technology, 36(5-6), 570-581. (SCI, EI)
  21. Chen, T. and Wang, Y.-C., (2008), "A Hybrid Intelligent Approach for Output Projection in a Semiconductor Fabrication Plant, Intelligent Data Analysis, 12(1), 129-144. (SCI)
  22. Wang, Y.-C., (2007) "A Note on 'Optimization of Multi-pass Turning Operations using Ant Colony System'," International Journal of Machine Tools and Manufacture, 47(12-13), 2057-2059. (SCI, EI
  23. Wang, Y.-C. and Usher, J. M., (2007) "A Reinforcement Learning Approach for Developing Routing Policies in a Multi-Agent Production Scheduling," International Journal of Advanced Manufacturing Technology, 33(3-4), 323-333. (SCI, EI).
  24. Chen, T. and Wang, Y.-C., (2007) "A Fuzzy-neural System with Error Feed-back to Adjust Classification for Forecasting Wafer Lot Flow Time - A simulation Study," Proceedings of Institution of Mechanical Engineers, Part I, Journal of Systems and Control Engineering, 221(5), 807-817. (SCI, EI)
  25. Wang, Y.-C. and Usher, J. M., (2005) "Application of Reinforcement Learning for Agent-Based Production Scheduling," Engineering Applications of Artificial Intelligence, 18(1), 73-82 (SCI, EI).
  26. Wang, Y.-C. and Usher, J. M., (2004) "Learning Policies for Single Machine Job Dispatching," Robotics and Computer Integrated Manufacturing, 20(6), 553-562.  (SCI, EI).

Referred International Conference Papers

  1. Wang, Y.-C., Chen, T., and Lin, C.-W., "A Slack-Diversifying Nonlinear Fluctuation Smoothing Rule for Job Dispatching in a Wafer Fabrication Factory," The 21st International Conference on Flexible Automation & Intelligent Manufacturing, Taichung, Taiwan, June, 2011.
  2. Wang, Y.-C., Chiu, Y.-C., and Hung, Y.-P., "Optimization of Multi-Task Turning Operation under Minimal Tool Waste Consideration," The 20th International Conference on Flexible Automation & Intelligent Manufacturing, Oakland, CA, July, 2010.
  3. Wang, Y.-C., Wang, Y., and Chang, S.-C., "Order Commitment Contracts in a Collaborative Supply Chain," International Symposium on Scheduling 2009, Nagoya, Japan, July, 2009.
  4. Wang, Y.-C. and Li, W.-J., "Joint Replenishment and Supplier Selection using Particle Swarm Optimization," The 19th International Conference on Flexible Automation & Intelligent Manufacturing, Middlesbrough, UK, July, 2009.
  5. Wang, Y.-C. and Chiu, Y.-C., "An Evolutionary Strategy for Optimizing Multi-pass Turning Operation under Dry Machining Conditions," The 41th CIRP Conference on Manufacturing Systems, Tokyo, Japan, May, 2008.
  6. Wang, Y.-C., "A Simulation Study of Measuring Supply Chain Performances under Unbalanced Retailer Demand Variability," IIE Annual Conference and Expo 2007, Nashville, TN, May, 2007.
  7. Wang, Y.-C., Kuo, H.-W., and Cheng, W.-T., "A Study of Solving the Joint Replenishment Problem using the RAND Method under Uncertain Holding Cost," The 4th International Conference on Supply Chain Management & Information Systems, Taichung, Taiwan, July, 2006.
  8. Wang, Y.-C. and Hung, C.-C., "Parallel Replenishment Policies between Collaborating Retailers," The 16th International Conference on Flexible Automation & Intelligent Manufacturing, Limerick, Ireland, June, 2006.
  9. Wang, Y.-C. and Yen, K.-N., "Exploring and Evaluating Flexibilities of a Supply Chain," The 36th International Conference on Computers & Industrial Engineering, Taipei, Taiwan, June, 2006.
  10. Wang, Y.-C. and Usher, J. M., ¡§A Reinforcement Learning Approach for Developing Routing Policies in a Multi-Agent Production Scheduling,¡¨ The 13th Industrial Engineering Research Conference, Houston, TX, May, 2004.
  11. Wang, Y.-C. and Usher, J. M., ¡§Learning Policies for Single Machine Job Dispatching,¡¨ The 13th International Conference on Flexible Automation & Intelligent Manufacturing, Tampa, FL, June, 2003.
  12. Wang, Y.-C. and Usher, J. M., ¡§A Study of Reinforcement Learning Applied to Dynamic Single-Machine Job Dispatching,¡¨ The 6th International Engineering Design and Automation Conference, Maui, Hawaii, August, 2002.
  13. Wang, Y.-C. and Usher, J. M., ¡§An Agent-Based Approach for Flexible Routing in Dynamic Job Shop Scheduling,¡¨ The 11th Industrial Engineering Research Conference, Orlando, FL, May, 2002.
  14. Usher, J. M. and Wang, Y.-C., ¡§Judging the Values of Additional Information on the Performance of Intelligent Agents in Manufacturing Control,¡¨ Conference on Intelligent Systems in Design and Manufacturing II, SPIE, Boston, MA, November, 2000.
  15. Usher, J. M. and Wang, Y.-C., ¡§Negotiation Between Intelligent Agents for Manufacturing Control,¡¨ The 4th International Engineering Design and Automation Conference, Orlando, FL, August, 2000.
  16. Usher. J. M. and Wang, Y.-C., ¡§Intelligent Agent Architectures for Manufacturing Control,¡¨ The 9th Industrial Engineering Research Conference, Cleveland, OH, May, 2000.

¡@